Lockwoods Lane
Located at The Brighton Hub, Lockwoods Lane is the first stage of a 17,000sqm, multi-site business park development.
Project aim
Our team project managed stage 1, from preliminary design through to construction. Progressively manage stages 2 & 3 to ensure project fluidity, whilst our client's timeline and budget specifications are maintained.
What we did
pitt&sherry provided multidisciplinary services through the entire project lifecycle.
These included:
- Planning
- Geotechnical
- Civil
- Water and Sewer
- Traffic
- Electrical
- Structural
- Building Surveying
“In the business of property development, time literally is money. A relatively small oversight during the design process, can easily delay a project for months. Such delays hurt the developers bottom line, and have potential to financially derail an entire project. That being so, when it comes choice of engineering firm, I only deal with the best.”
Robbie Williams, Director MBDM
Project team
Client: MBDM
Design Team: pitt&sherry, DesignHaus